The bridge which connects the island of Murter with the mainland is raised:
From 15.5. to 15.9. every day :
09:00 to 09:30 17:00 to 17:30
Važna obavijest
The bridge which connects the island of Murter with the mainland is raised:
From 15.5. to 15.9. every day :
09:00 to 09:30 17:00 to 17:30